Facility Compliance, Safety, and Engineering Support

A food manufacturing facility required engineering support across several areas of facility operations, including air permitting, structural modifications, building code compliance, and life safety planning. Chief Engineering provided consulting and design services to help the facility address regulatory requirements, improve operational efficiency, and maintain accurate safety documentation as its needs evolved.

The Challenge

The facility’s projects involved a range of technical and regulatory considerations. Chief Engineering was tasked with evaluating air permitting requirements for existing and planned natural gas-fired ovens and boilers, preparing a non-Title V air permit application for 26 bread baking ovens and two boilers, and assessing structural requirements for an expanded wall opening to improve forklift traffic between production areas. Additional work included evaluating fire-rated door requirements following a new opening in an existing concrete wall and developing an updated Life Safety Plan to support the facility’s Emergency Action Plan. These projects required coordination across engineering disciplines, regulatory agencies, and external resources while responding to the facility’s rapidly moving operational priorities.

The Solution

Chief Engineering provided targeted engineering consulting and documentation across each area of need. For air permitting, the team evaluated applicable requirements, developed emissions estimates and a facility-wide emissions inventory, and prepared supporting documentation for submission to the Tennessee Department of Environment and Conservation.

For facility improvements, Chief performed structural engineering analysis to support the enlarged wall opening and assessed applicable building code requirements related to fire-rated separation and door installation. The team also conducted an on-site walkthrough to verify existing fire and life safety equipment and incorporated the findings into an updated Life Safety Plan. The final documentation included facility information, emergency resources, equipment locations, and floor plan drawings intended for use throughout the facility.

Project Takeaways

The project highlighted the importance of early coordination with regulatory agencies and specialized external resources. The air permitting effort took longer than anticipated because additional information and coordination were needed, reinforcing the value of contacting the appropriate agencies early in the process. The Life Safety Plan also expanded to include additional requests related to fire hydrant identification, requiring further coordination and time beyond the initial drawing scope.

Across these projects, Chief Engineering demonstrated the flexibility required to support an active manufacturing facility with evolving engineering and compliance needs. The experience reinforced the importance of clearly defining project scope, anticipating additional coordination requirements, and maintaining access to specialized local resources to support future work.