Project Overview
An industrial facility needed to reconfigure an existing process area to separate ingredient streams and reduce the risk of cross-contamination during downstream processing. The original configuration combined multiple ingredient streams in a central hopper, preventing the separation required to feed three existing mixers independently. Chief Engineering was engaged to develop a new equipment arrangement that would improve process functionality while working within the facility’s tight vertical clearances.
The Challenge
The project required removing the central hopper, relocating two existing day bins, and installing four new loss-in-weight feeders, associated slide gates, and two sets of three-way diverter valves. The redesigned system needed to establish separate gravity-fed ingredient streams to three existing mixers without planned modifications to the building structure. With installation scheduled during a mandatory five-day plant shutdown, the proposed arrangement needed to be verified in advance to identify potential interferences and support an efficient installation process.
The Solution
Chief Engineering developed a digital stack-up by integrating proposed equipment models with a client-provided 3D scan of the facility. Using Prevu3D for the first time, the team created a digital representation of the proposed arrangement to evaluate clearances, identify potential clashes, and verify that the equipment could fit within the existing space. This initial phase confirmed the feasibility of the new configuration without planned structural modifications.
Following approval of the digital arrangement, Chief progressed to the construction documentation phase. The scope included detailed mechanical layouts, equipment coordination, connection layout definition, and construction drawings to support installation during the planned shutdown. An optional piping layout for the relocated mixer station resin piping was also included in the proposed scope.
Project Takeaways
The project demonstrated the value of integrating 3D scanning and digital modeling into equipment arrangement projects, particularly when working within tight spaces and limited installation windows. Prevu3D helped the design team evaluate the proposed layout more efficiently while providing the client with a clear visualization of the equipment configuration.
The client was pleased with the result, and the project highlighted an opportunity to apply this technology to future engineering work. By identifying potential clashes and verifying equipment placement before installation, digital modeling can help teams make informed design decisions and better prepare for complex plant modifications.