
Loading Dock Roll-Up Door Structural Design
A manufacturing facility needed to improve access and functionality within its loading dock area by adding a new roll-up door opening to an existing CMU wall. Because the modification involved

A manufacturing facility needed to improve access and functionality within its loading dock area by adding a new roll-up door opening to an existing CMU wall. Because the modification involved

A facility required an engineering evaluation of an existing tank roof after limited inspection and thickness testing raised questions about whether the structure could safely support personnel during routine maintenance

A facility in Sioux City, Iowa required additional engineering support during a cyclone system upgrade. As an extension of a previous project, Chief Engineering was brought in to develop installation

A facility in Charlotte identified a critical structural concern involving the steel framework supporting its ammonia condensers. Years of exposure had resulted in severe corrosion and section loss, leaving portions

Project Overview During the expansion of a facility, newly installed suspended drain lines and piping systems required structural verification and seismic bracing to meet applicable building codes. While the expansion

Project Overview At a Manufacturing Company facility in Mississippi, a new char container tipper system was planned to improve loading operations and streamline product transport. The system would enable efficient

Project Overview A processing facility identified a critical need to replace an aging flaker system that was no longer supported by the original manufacturer. The outdated equipment posed operational risks

Project Overview A gypsum manufacturing facility faced a significant operational shift due to the upcoming shutdown of its existing flue gas desulfurization (FGD) gypsum supply produced by a nearby power

When a national engineering contractor needed a structural survey conducted at a military facility, our team was selected to support the effort. The project involved assessing trusses within a designated

A longtime industrial client preparing for an upcoming tank installation needed a fast, reliable structural engineering assessment to verify that its proposed shim and base plate configuration would properly support
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
Google Tag Manager simplifies the management of marketing tags on your website without code changes.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)